Case Study: the Data Centre

The Client

A Data Centre in East London.

The Challenge

New Data centre install. Supply, Install and commission of parallel UPS systems. Supply and installation of over-head cabling on dedicated perforated tray to supply rack PDU commando sockets. Main power cables, Bypass Panel& Distribution required. Works were completed on site with other specialist contractors working in the same area/building.

The Solution

Ensuring our Advanced Solution UPS team are able to safely carry out their works around other contactors. Remaining aware, flexible and adaptable to the dangers, demands and time constraints of other on-site works being carried out.

The Client’s Perspective

 "Advanced Solutions UPS Ltd offered a complete supply and installation package. We were able to save the project additional funds as the Advanced Solutions design team identified a more cost effective and energy efficient solution prior to procurement taking place."

The Outcome

A brand new data centre competed, load bank tested and ready to be populated with the client’s critical load equipment. Another project completed ahead of schedule.