Case Study: European Specialist Security Company

The Client

A European specialist security Company

The Challenge

Installation works within multiple mobile shipping containers which were then moved to separate sites for completion of install, testing and commissioning. The client required our specialist engineers to install UPS systems, standby generators and bespoke electrical works to support their rack mounted critical loads. Works were carried out on restricted access sites, with limited power and tight time deadlines.

The Solution

Our team of Advanced Solutions UPS Ltd designers worked with the client on their system/design requirements to meet their needs. Changes to the clients’ requirements during the installation works required that our team meet the challenges that these unexpected changes posed and adapt to complete the project on schedule and to a high standard. Good communication between our Project Manager/Engineers and the client allowed us to remain flexible and efficient in the face of restricted access issues and periods of bad weather. One of our mobile generators allowed us to carry out the necessary works, testing and commissioning despite the lack of available mains power during the initial install.

The Outcome

Works were completed within the timescale required and to the high standards demanded by the clients’ specifications. Each container & generator has now been located, commissioned and tested by our Commissioning team.